add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mazda 6 (2002 release)

general info. full specifications. diagnostics. hints. tips. tricks
Mazda 6
Home
 
Mazda
6
Operation and maintenance of car
Engine
Transmission
Chassis
Steering Gear
Brakes
Onboard electric
Overview
Power supply system
Accumulator battery
Checking the state of charge of the battery
Charging the battery
Charging the battery fully discharged
Battery care
Storage Battery
Check fully charged battery
Removing and installing the battery
Generator
Starter
Lighting system
Screen wipers and washer
Immobiliser
The central panel and speakers
The instrument cluster and controls
Restraint System
Body
 


Hit Counter by Digits


print page printable version

Removing and installing the battery



When disconnecting the battery from the memory unit of the central control system of the engine and gearbox, anti-lock braking systems, as well as the memory of other electrical appliances such as radios and watches erased data occurred failures. Once connected, re-program the appropriate instruments. Some of the radios are installed as standard security code. Which prevents unauthorized use of the radio if its power is turned off. Power and clock radio is switched off if, for example, disconnected battery, lifted the receiver, or the fuse blows.
Unscrew the nuts and remove the "negative" terminal, and then "positive" terminal of the battery.
Remove the nut bracket battery.
Remove the bracket supporting the battery.
Remove the battery.
Before installing the Clean terminal of the battery, this will suit a brass wire brush. To prevent corrosion cover the battery terminals with special grease.
Battery installation spend to sequences, return to removal.
Tighten bracket Battery torque 6-8 Nm.
Tighten the nuts of the battery terminals torque 9-12 Nm.




« previos page
Check fully charged battery
next page »
Generator

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.