| 1. Set a special plate 1, drawing 3 and 4 reception indicator 5. | 
| 2. Set the indicator leg 6 on the end of the rod 7 fork backing and ensure preload indicator 1 mm. | 
| 3. Measure the axial movement of the rod 7 indicator, giving a corresponding movement of the rod 7. | 
| 4. Divide the two readings taken with the axial movement of the rod 7 and set in the middle position, fixing it with the screw 2. | 
| 5. Move the lever 10 in the direction reverse using the lever and the adjustment slider to set the finger 8. | 
| 6. Remove the indicator by moving your finger to stop the slide 8. | 
| 7. Install the finger 8 of the slider in the middle position on the basis of statements and fix the screw 9. | 
| 8. Remove the display 5 with a support stand 3 and 4. | 
| 9. Loosen the bolt 12 so that the coupling sleeve 13 moves freely in the internal lever 14 shift. | 
| 10. Set the inner lever 14 to the center position. | 
| 11. Fit the clutch housing dowel pins. | 
| 12. Remove the gearbox housing a special plate 1 and install it on the clutch, turning 180 ?°, with an 8 slide your finger should get into the coupling sleeve 13. If necessary, correct coupling sleeve with a screwdriver. | 
| 13. Secure the coupling sleeve 13 bolt 12. |