add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Audi A6 (1997 release)

general info. full specifications. diagnostics. hints. tips. tricks
Audi A6
Home
 
Audi
A6
General Information
Operation of the vehicle
Maintenance
Engines
Four-cylinder petrol engines
Overview
Control parameters of the engine parts
Tightening torques of the main threaded connections
Removing and installing engine
Ribbed belts
Belt
Bracket alternator, power steering pump (WTP) and the fan with viscous coupling
Toothed belt
Front Crankshaft Seal
Dual mass flywheel
Crankshaft
Cylinder head cover
Cylinder Head
Gas distribution mechanism
Checking the hydraulic valve lifters
The pistons and connecting rods
Six-cylinder petrol engines
Diesel engines 1.9 l
Diesel engines 2.5 l
Ignition, fuel injection and exhaust of gasoline engines
The power supply system, and preheating the exhaust gases of diesel engines
Lubrication System
Cooling system
Coupling
Transmission
The front wheel drive shafts
Design features four-wheel drive transmission
Suspension
Wheels and tires
Steering
Brakes
Body
Heating and air conditioning
Electrical
Electric schemes
 


Hit Counter by Digits


print page printable version

Checking the hydraulic valve lifters



Proper installation of the valve clearances largely determines the engine. If the valve clearances are too large, noise increases and decreases engine efficiency because the valves are opened too late and closing early. If the valve clearance is too small, the valves can not be closed completely on the hot engine, which can cause serious damage.
On engines mounted hydraulic tappets, which automatically under pressure in the lubrication system compensate for the gap between the cam of the camshaft and the corresponding valve stem. Therefore, the operation does not require regular inspection and adjustment of valve clearance. However, the need to use engine oil of good quality and recommended viscosity and replace it with the desired frequency. When starting a cold engine there is a slight delay in equalizing the engine oil pressure in all parts of the engine, especially in a hydraulic pusher. Valves can knock about 10 seconds, and then begin to work silently.
If the engine does not start a few days, the valves can knock over a long time, since almost all of the oil flows from the top of the engine and the working surfaces of bearings. At this time, care must be taken not to damage the motor: Avoid sudden changes in engine operation, until all jacks are filled with engine oil. When engine warming rate of rotation for 2 minutes should not exceed the speed of "fast" idling (from 2000 to 2500 min-1), or until no knock valves. If the noise does not stop pushers, stop the engine and perform the following steps.
Make sure that the engine temperature is at least 80 ?� C - the engine should be heated.
Remove the cylinder head cover.
While cranking the engine, set the cam located on verifiable pusher, straight up, so it is not working on a pusher.

Check of a free wheeling of a pusher
Fig. 1.3.72. Check of a free wheeling of a pusher


Press pusher a wooden or plastic wedge (Fig. 1.3.72). If the free wheeling of a pusher greater than 0.2 mm, the plunger must be replaced.
Install the cylinder head cover.
Wait 30 Mindo starting the engine for the hydraulic tappets to come back to normal, because otherwise the pistons may hit the valves.




« previos page
Gas distribution mechanism
next page »
The pistons and connecting rods

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.