1. Pick up the entire car and establish on supports. |
2. Turn the selector to position N. |
3. Remove the front wheels. |
4. Drain the coolant, tighten the drain plug. |
5. Remove the battery. |
6. On vehicles GE16DE remove an air filter. |
7. Disconnect the double switch and solenoid. |
8. Remove the kick-down-the cable from the throttle body. |
9. Remove the nut and remove the cable from an arm and staples. |
10. Disconnect the cable from the lever transmission, remove the clamp and remove the cable. |
11. Clamp collars coolant hoses, remove the nozzle and disconnect hoses. |
12. Remove the semi-axis (see. Subsection 10.2). |
13. Remove a reception exhaust pipe. |
14. Remove the starter. |
15. Remove the bottom cover and remove the crankcase transmission torque converter bolts, turning the crankshaft. |
16. hang out the engine on the hoist or lift jack. |
17. Roll the aerial platform and prop up the transmission. |
18. Remove the nut and get a coupling bolt of a back support of the engine. |
19. Remove the three screws and remove the bracket. |
20. Remove the stop ring. |
21. Remove the nut and get a coupling bolt of the left engine mounts. |
22. Remove the three bolts and remove a support and cushion. |
23. Secure the torque converter. |
24. Remove the bolts from the transmission pre denoting the place of each bolt (bolts are of different lengths). |
25. Make sure that all the necessary parts are disconnected and can not prevent removal. |
26. Carefully post to the left and roll platform with the transmission. |
27. Remove the pins if weakened their landing. |