add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
The petrol engine of 1.4 and 1.6 liters
Kinds of repair without dismantling the engine from the vehicle
Dismantle and engine major repairs
Technical data
Engine Overhaul
Diagnostics of the engine with the help of the gauge
The power unit with manual transmission
The power unit with automatic transmission
Cylinder Head
Cylinder Head and Valves
The pistons and connecting rods
Crankshaft
Cylinder block
The connecting rod-piston group
Main and connecting rod bearings
Piston rings
Start the engine after major repairs
The petrol engine of 2.0 liters
Diesel engine
Cooling
Heating and ventilation system
Fuel and exhaust system
The system of the engine is started
Coupling
Transmissions
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

Start the engine after major repairs



PERFORMANCE ORDER
1. After assembly double check the engine oil level and coolant.
2. Check the wiring connections and hoses from the engine compartment to remove any foreign objects.
3. Disconnect spark plug wire and remove the spark. Remove the high-voltage wire from the distributor cap and securely connect to weight.
4. Turn the crankshaft starter to the extinction of a control lamp of emergency pressure of oil.
5. Replace candles and replace the spark wire and wire distributor.
6. Start the engine. The engine should start after a short period of time required to fill the petrol fuel line.
7. With the engine warm up carefully watch for leaks of oil, fuel or coolant. Allowed a strange odor and smoke from the parts exposed to high temperatures because of burning oil residues.
8. If everything is in order, then wait until it warms up the upper radiator hose, and then stop the engine and check the oil levels and the coolant.
9. Check the ignition and idle speed, stop the engine.
10. After a few minutes, check the oil level and coolant, if necessary.
11. If the cylinder head bolts are tightened in accordance with the present disclosure, when you first start the engine after major repairs to tighten bolts of a head is not necessary.
12. If you have installed new pistons, rings, main and connecting rod bearings, the engine must be run for the first 800 kilometers.
13. In the running-in period is not permitted to ride full throttle or too low speed in any gear.
14. It is recommended that after the break-in oil change and filter.




« previos page
Piston rings
next page »
The petrol engine of 2.0 liters

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.