add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
Cooling
Heating and ventilation system
Fuel and exhaust system
The system of the engine is started
Coupling
Transmissions
Manual Transmission
Technical data
The mechanism of gear changes
Seals
The sensor neutral position
Reversing switch signal
Gearbox speedometer
Automatic transmission
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

The mechanism of gear changes



Withdrawal

PERFORMANCE ORDER
1. Remove the center section of the front panel.
2. Lift the front of the car and establish on supports.
3. Unhook the spring rod of inclusion of transfers.
4. Loosen the nuts and remove the bolts axis of the rod and gearshift lever.
5. Remove the stem from the bracket at the checkpoint, remove the nuts and remove the yoke from the bottom and remove the rod from the holder.
6. Remove the bracket, remove the lever gearbox, remove the small cover at the base of the lever.
7. If necessary, unscrew the nut, remove the box cover, remove the clamp and remove the cover.
8. Check the condition of the parts, especially plugs axis and hinge rod, replace worn-out covers.

Setting

PERFORMANCE ORDER
1. Installation is performed in reverse order.
2. Grease the bush and the axis of the rod.
3. Tighten the nuts and bolts with the set moment.




« previos page
Technical data
next page »
Seals

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.