add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
Cooling
Heating and ventilation system
Fuel and exhaust system
The system of the engine is started
Coupling
Transmissions
Axles
Technical data
Removing the half-line
Installation of the half-line
Repair and replacement of half-line of protective covers
Check SHRUS
Bearing intermediate support right semiaxis
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

Bearing intermediate support right semiaxis



Replacement

PERFORMANCE ORDER
1. Remove the right axle.
2. Remove the inner CV joints, bearings and bearing housing.
3. Hold the axle shaft in a vise and Xpress gryazeotrazhatel hammer on the mandrel.
4. Pry and remove the bearing cover on the side that faces inward.
5. Remove the bearing retaining ring.
6. Xpress bearing assembly to the body from the axle shaft. If the bearing is changed, it can be gently knock hammer on the mandrel.
7. Remove the bearing retaining ring from the outside.
8. Remove the bearing cap.
9. Extract the bearing housing from the blows of the mandrel, which rests on the outer ring.
10. Before assembly, put in the bearing grease.
11. Press in the bearing in the housing so as to be able to install the cover and retaining ring.
12. Install the palm under the inner ring and press-fit into the bearing axle shaft blows to end through the wooden prorate so that you can install an internal lock ring.
13. Carefully press them gryazeotrazhateli.
14. Install the CV joint.
15. Install the shaft.




« previos page
Check SHRUS
next page »
Brakes

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.