printable version
Solenoid valves
Check
Check conduction circuit
PERFORMANCE ORDER | 1. Disconnect the 26-pin connector on the automatic transmission control unit. | 2. Check for continuity between tracks V, Y, Z and "weight" (valves number 1, ?�� 2). | 3. Check for continuity between tracks A and U (pressure control valve). | 4. At negative results check for breaks or short circuits in the wires. |
|
|