add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mazda 6 (2002 release)

general info. full specifications. diagnostics. hints. tips. tricks
Mazda 6
Home
 
Mazda
6
Operation and maintenance of car
Engine
General description new engines models L8, LF, L3
The mechanical part of engines
Engine Model L8 or LF
Checking the contents of the CO / CH in the exhaust gas
Measurement of engine compression
Verify accessory drive belt
General information and safety when removing the power unit
Removal of sealant
Removal and installation of the power unit
Check actuator variable valve timing (L3)
Removal and installation of the actuator variable valve timing (L3)
Timing chain drive
Removal and installation of the oil control valve (OCV) (L3)
Checking the oil control valve (OCV) (L3)
By operation of the spool valve (OCV) (L3)
General repair operations on the power unit
Dismantling the cylinder head (beginning)
Dismantling the cylinder head (end)
Dismantling cylinder (beginning)
Removing and installing crankshaft rear oil seal
Dismantling cylinder (the end)
Check the cylinder head
Assembling the cylinder (the beginning)
Assembling the cylinder (the end)
Assembling the cylinder head
Assembling the valve timing
Appendix 1
Annex 2
Appendix 3
Transmission
Chassis
Steering Gear
Brakes
Onboard electric
Body
 


Hit Counter by Digits


print page printable version

Dismantling cylinder (the end)



The components of the second-stage cylinder dismantling
Fig. 2.134. The components of the second stage of disassembly of the cylinder 1 - a balancing unit (L3, L3 to the valve timing change mechanism); 2 - a cover of a rod; 3 - the lower connecting rod bearing; 4 - the top connecting rod bearing; 5 - the connecting rod and piston assembly; 6 - piston ring; 7 - a cover of the radical bearing; 8 - Lower main bearing, thrust bearing; 9 - the crankshaft; 10 - upper main bearing, thrust bearing; 11 - maslorazbryzgivayuschego valve nozzle; 12 - the block of cylinders; 13 - shim


Remove the balancer unit (motors L3, L3 with variable valve timing mechanism. See Fig. 2.134).
Remove the connecting rod cap. Before removing the cover, check the connecting rod side clearance of the connecting rod (see. Below). Remove the connecting rod bolt from the connecting rod cap, nylon bolt hitting the hammer.
Remove the lower connecting rod bearing.
Remove the upper connecting rod bearing.
Remove the connecting rod and piston assembly.
Remove the piston rings.

Order of easing of bolts main bearing caps
Fig. 2.135. Order of easing of bolts main bearing caps


Before removing main bearing caps, check the axial clearance of the crankshaft. Loosen the bolts main bearing caps for two or three steps in the order shown in Figure 2.135.
Remove the lower molars and thrust bearings.
Remove the crankshaft.
Remove the upper crankshaft bearings, thrust bearings.
Remove the valve maslorazbryzgivayuschego nozzle.




« previos page
Removing and installing crankshaft rear oil seal
next page »
Check the cylinder head