add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
Cooling
Heating and ventilation system
Fuel and exhaust system
Carbureted engines
Engines with fuel injection system
Technical data
Air filter
The accelerator cable
Throttle pedal
Fuel
Fuel Injection System
Decompression of the fuel system
Fuel pump
Fuel Level Sensor
Fuel tank
Fuel Injection System
Throttle Body
Units of the fuel injection system
Suction collector
An exhaust manifold
Exhaust system
The power supply / exhaust
Emission of exhaust gases
The system of the engine is started
Coupling
Transmissions
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

An exhaust manifold



Withdrawal

PERFORMANCE ORDER
1. Disconnect the exhaust gas sensor from the wiring.
2. Remove the screws and remove the cover collector.
3. Remove the nut and remove the choke tube recycling.
4. Turn on the hand brake and lift the front of the vehicle.
5. Remove the nut and bolt and remove a reception exhaust pipe, remove the gasket.
6. Remove the nuts and bolts of the exhaust manifold to the cylinder head in the reverse order.
7. Remove the manifold and gasket.

Setting

PERFORMANCE ORDER
1. Installation is performed in reverse order.
2. Before assembly, replace all gaskets, thoroughly clean split plane, replace or restore damaged studs.
3. Tighten the bolts and nuts with a torque wrench in the specified sequence.




« previos page
Suction collector
next page »
Exhaust system

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.