add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mazda 626 (from 1991 to 1998, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Mazda 626
Home
 
Mazda
626
Instructions
Maintenance
Engines
Petrol engines (1,6 and 1,8 liters)
Gasoline 4-cylinder engine (2 liters)
Gasoline engine V6 (2,5 liters)
Introduction
Specifications
Recommendations for repair
The top dead point of the first piston
Cylinder head cover
Springs, fasteners and gaskets Valve
Gas distribution belt and sprocket
Camshafts and tappets
Intake manifold
Exhaust manifolds
Cylinder heads
Front crankshaft oil seal
Sump
Oil pump
A flywheel or a leading disk
Crankshaft rear oil seal
Engine Mounts
A partition of engines (1,6 and 1,8 liters)
Bulkhead engine (2.0 liters and 2.5 V6)
The diesel engine of 2.0 liters
Systems of an electric motor
Heating and ventilation
Fuel system
An exhaust system
Transmissions
Coupling and semiaxes
The brake system
Chassis
Body
Electrical
Wiring
Tips and Tricks
 


Hit Counter by Digits


print page printable version

Specifications



Are common

Bore
83 mm
The piston stroke
73 mm
Volume
2.5 liters

Numbering of cylinders (from the timing belt to the gearbox)

- back row

1-3-5
- front row
2-4-6

The sequence of cylinders

1-2-3-4-5-6

Numbering of cylinders and location of the contacts the distributor cap ignition ignition coil and contacts


The front part of the car
Oil pump:

- The gap between the driven gear and the pump casing

0.218 mm max.
- The gap between the teeth of gears
0.195 mm max.
- The gap between the plane and the plane of the gear pump housing
0.128 mm max.
- The length of spring relief valve
46.050 mm

Torques Nm

Bolts of an arm of the compressor of the air conditioner
38 - 52
Bolts and nuts intake manifold
19 - 25
Bolts and nuts of a final collector
19 - 25
Bolts insulating shield of the exhaust manifold
8 - 10

Bolt crankshaft damper

157 - 165
Timing belt cover bolts
8 - 10

Bolts intermediate pulley

37 - 52

Timing belt tensioner bolt

37 - 43
Bolts timing belt tensioner arm
19 - 25

The bolts of asterisks of camshafts

122 - 140

Bolts of covers of bearings of camshafts

11 - 13

Bolts cylinder head:

- Stage 1
17 - 19
- Stage 2
Tighten for 90 ?�

- Stage 3

Tighten for 90 ?�
Bolts of the oil pallet:
- Long bolts
19 - 25
- Short bolts
8 - 10
- Bolts of a baffle sump
19 - 25

- Bolts of the oil pump

19 - 25
- Fitting bolts maslozabornogo
8 - 10

- Bolts of a flywheel or a leading disk *

61 - 66

- The cylinder head cover nuts

5 - 8
Engine Supports *:

- The right support:

??? nuts
73 - 103
??? through bolt
68 - 92
- Front support

??? nuts

75 - 104
??? through bolt
85 - 117
- Back support

??? nuts

68 - 92
??? through bolt
85 - 117

- Left support:

??? nuts

68 - 92
??? through bolt
68 - 92
- Lower support:

??? nuts

43 - 60
??? bolts
56 - 80

* Before installation, lubricate the thread sealant.




« previos page
Introduction
next page »
Recommendations for repair

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.