add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Volkswagen Sharan (from 1995 to 2000, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Volkswagen Sharan
Home
 
Volkswagen
Sharan
Introduction
VR6 engine
The two-liter engine (ADY)
Engine oil
Cooling
A fuel injection system VR6 engine
The system Simos injection 2.0-liter engine
The ignition system
General description and operation of the ignition system
The main system components plug
Precautions during repair work on the ignition system
Carrying out repairs and maintenance of the ignition system
General Inspection of the ignition system
Checking the coil (s) of ignition
Check the Hall sensor
Check knock sensor
The ignition distributor 2.0-liter engine
Adjust the ignition timing 2.0-liter engine
Spark plug
Coupling
Manual 5-speed gearbox
The drive shafts
Power steering
Front suspension
Rear suspension
Brakes
Electrical
Diesel engine
The lubrication system of the diesel engine
The cooling system of the diesel engine
The power supply system of the diesel engine and turbocharger
Map service.
Applications
Wiring
 


Hit Counter by Digits


print page printable version

Checking the coil (s) of ignition



In the ignition coil winding resistance is checked whether there is insulation between the windings and insulation breakdown to the "masses." The breakdown of the insulation on the "weight" is found on the burnout or melt out the plastic shell of the ignition coil. Measuring the resistance winding of the ignition coil ohmmeter.
Check the ignition coil in the following order.
2.0 liter engine:
- Switch off the ignition and remove the high-voltage wire from the transformer high voltage;

Terminals "1", "4" and "15" on the high voltage transformer, to test resistance of the primary and secondary windings of the ignition coil to a 2.0 liter engine
Fig. 215. The terminals "1", "4" and "15" on the transformer high voltage to test the resistance of the primary and secondary windings of the ignition coil on the 2.0-liter engine





- Connect the ohmmeter between terminals "1" (positive) and "15" (minus) (Fig. 215) and measure the resistance of the primary winding, which should be 0.5-1.2 ohms;
- Connect the ohmmeter between terminals "15" and "4" (Central Line) and measure the resistance of the secondary winding, which should be 3 - 4 kW;
- If the resistance is not in conformity with the values, it is necessary to set a new high-voltage transformer.
VR6 engine
It is recommended to check the ignition coil VR6 engine in the SRT.




« previos page
General Inspection of the ignition system
next page »
Check the Hall sensor

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.