add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Mercedes-Benz C-Class (W203, 2000 issue)

general info. full specifications. diagnostics. hints. tips. tricks
Mercedes-Benz W203
Home
 
Mercedes-Benz
W203
Introduction
Instruction Manual
Routine maintenance
Engine
Cooling and heating
The power supply system and release
Electric motor
Ignition and engine control
System of preheat of the diesel engine
Diagnostics of systems of electronic control and diagnostic equipment
Charge and start systems
Battery - basic information and the acquisition of new battery
Check the battery and charging
Replacement Battery
Storage Battery
Charging System - general information and safety measures
Check the charging system
Removing and installing the generator
Removing and installing voltage regulator. Replacement brush
The system start the engine - the general information and precautions
Removing and installing starter
Removal and installation of the traction relay of a starter
Checking the engine starting system
Manual gearbox
Automatic Transmission
Coupling and power shafts
Brakes
Suspension and steering
Body
Onboard electric
 


Hit Counter by Digits


print page printable version

Removing and installing voltage regulator. Replacement brush



Gasoline engines 111, 112

Withdrawal

PERFORMANCE ORDER

1. Remove the generator refer to the appropriate section.
2. Remove the nuts on the terminals.

3. Remove the screws (1) and remove the protective cover from the generator (2), spreading with the locking plate (3).

Depending on the model, the engine may be installed generators of various capacities.

4. Remove the screws (4) and remove the side knob (5). (6) - joining the masses.
5. Replace the brushes, which Unsolder cables.
6. Check the wear of contact rings, if necessary pierce them and polish (work HUNDRED).


Setting

PERFORMANCE ORDER

1. Insert the new brushes () and springs (B) in brush holder (C) and solder them. Illustration is only informative, and can not fully comply with this model.

2. To exclude getting into the solder for soldering the new brushes, pliers hold the cables.

Solder leads to hardening of the ropes, which makes them not operational.

3. Fit the pressure regulator.
4. After installing the new brushes check the ease of travel to the brush holder.
5. Secure the generator protective cover.
6. Secure the nuts on the terminals.
7. Set the generator refer to the appropriate section.





« previos page
Removing and installing the generator
next page »
The system start the engine - the general information and precautions

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.