add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Kia Rio (2000 release)

general info. full specifications. diagnostics. hints. tips. tricks
Kia Rio
Home
 
Kia
Rio
Instructions
Engines A3E, A5D
Technical data
Compression Test
Camshafts
The pistons and connecting rods
Crankshaft
Checking the connecting rod and indigenous inserts
Air filter (ACL)
The accelerator cable
Cylinder Head
Check valves
Check the valve seat
Check the valve spring
Toothed belt
Exhaust
Greasing system
Cooling
Fuel system
Ignition system
Coupling
Transmission
Axes and power shafts
Suspension
Wheels and tires
Steering
Brakes
Body
The air conditioning system
Electrical equipment
 


Hit Counter by Digits


print page printable version

Checking the connecting rod and indigenous inserts



PERFORMANCE ORDER
Check the connecting rod and indigenous inserts the absence of local corrosion, and other development.

Selecting the root liners Crankshaft

Identify the codes on the cylinder block and crankshaft.


Code on the crankshaft
Code on the cylinder block
A
???
FROM
A
black
blue
red
???
brown
black
blue
FROM
green
brown
black

The size of the hole to insert the indigenous

Code
The size of the hole to insert the indigenous
A
54,000-54,006 mm
???
54,006-54,012 mm
FROM
54,012-54,016 mm

The thickness of the indigenous liner

Root liner
Thickness
Standard size
yellow
2,007-2,010 mm
green
2,010-2,013 mm
Cinnamon.
2,013-2,016 mm
black
2,016-2,019 mm
blue
2,019-2,022 mm
red
2,022-2,025 mm
Actual size
0.25 mm
2,133-2,137 mm
0.5 mm
2,258-2,262 mm
0.75 mm
2,338-2,387 mm

Setting

PERFORMANCE ORDER
1. Clean the indigenous and crank pins of grease and lubrication holes blow compressed air.
2. Install main bearing shells on the engine block.
3. Establish persistent half rings of a cranked shaft.
4. Install the crankshaft main bearing shells in the cylinder block.
5. Install the remaining main bearing shells in main bearing caps of the crankshaft.
6. Place the pieces of plastic dipstick Plastigauge on the necks of the crankshaft bearing.
7. In accordance with the label, set the crankshaft bearing caps.
8. Tighten the crankshaft bearing caps of the crankshaft.

Torque: 54-59 N ??? m


A warning

Do not turn the crankshaft when measuring the gap crankshaft bearing.


9. Remove the screws and remove the crankshaft bearing caps of the crankshaft. The measuring template measure width of deformed plastic core Plastigauge and define backlash size.

A warning

The widest portion of the rod Plastigauge corresponds to the smallest gap and the narrowest portion corresponds to the largest gap.


10. If the backlash exceeds the limit, pereshlifuyte crankshaft journal and use repair loose leaves of the increased size.

Nominal backlash: 0,018-0,036 mm
Maximum permissible backlash: 0,08 mm

11. Remove the crankshaft to the cylinder and remove the deformed plastic core Plastigauge with the crankshaft journals and main bearing shells.
12. Apply a thin coat of engine oil to the main bearing shells in the cylinder block and install the crankshaft inserts.
13. Apply a thin coat of engine oil to the crankshaft main journals and loose leaves in covers of radical bearings.
14. In accordance with the marking install main bearing caps of the crankshaft.

15. In certain sequence tighten bolts of covers of radical bearings of the crankshaft.

Torque: 54-59 N ??? m

16. Turn a cranked shaft and check that it rotates easily and smoothly.
17. Establish a measuring tip of a dial indicator on the front end of the crankshaft.
18. Move the crankshaft axis to stop and set the scale of dial gauge to zero.

19. Move the crankshaft axis to the other side to stop and read the values of axial clearance on the scale indicator.

Crankshaft end play: 0,080-0,282 mm

20. If the axial play exceeds the allowable value, replace persistent half rings of a cranked shaft.

Thickness of persistent half rings

Stubborn semicircle
Thickness
Rated
2,500-2,550
Nominal (0.25)
2,625-2,675
Nominal (0.50)
2,750-2,800
Nominal (0.75)
2,875-2,925

21. Manually install the O-ring in the back cover of the cylinder. Special adaptation push the O-ring in the back cover so that the end of the ring is flush with the cover.
22. Replace the back cover and fix bolts.
23. Install the pistons with rods.
24. Install the flywheel, the front cover, cylinder head, oil sump and timing belt.




« previos page
Crankshaft
next page »
Air filter (ACL)

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.