1. Set the engine with the transmission in the engine compartment of the vehicle. |
2. Screw the two nuts rubber support ?��3 power unit. Torque: 60-85 N ??? m |
3. Screw the bracket bolts support ?��3 power unit and screw the nuts of the rubber mounts. Tightening torques: Nuts: 66-93 N ??? m Bolts: 37-52 N ??? m |
| 4. Replace the four screws and nuts of the engine to the lower beam. Tightening torques Nuts: 37-52 N ??? m Bolts: 71-93 N ??? m |
5. Remove the lifting device, which supports the engine. |
6. Install the new lock ring on the drive shafts. |
7. Lightly tap, set the internal hinge of equal angular velocity drive shafts in the gearbox, with the cut of a lock ring should be directed upwards. |
8. Install the lower part of the shock absorber on the knuckles and secure them with bolts and nuts. |
9. Install the ball joint of the lower arm front suspension knuckles. |
| 10. Install the ball joint tips of steering drafts in rotary fists. |
11. Establish a reception exhaust pipe and catalytic converter. Torque: 37-52 N ??? m |
| 12. Install the air conditioning compressor. |
13. Connect the electrical connectors to the B-terminal connector of the generator |
| 14. Connect the electrical connectors to the B terminal and the S-contact starter. |
15. Connect the hoses to the power steering pump. |
16. On cars with automatic transmission, connect to a transmission cooler hose for transmission fluid. |
| 17. Connect the electrical connector to the solenoid valve. |
| 18. Connect the electrical connector to the switch gear position indicator. |
19. Install the clutch slave cylinder and connect it to the phone. The inhaling moments: 18,6-25,5 N ??? m |
20. Attach the traction control and gear selection. Tightening torques: Traction control: 37-52 N ??? m Link selection: 16-235 N ??? m |
21. Secure the nut with the thrust washer automatic transmission. The inhaling moment: 31,4-46,1 N ??? m |
| 22. Connect the electrical connectors to the engine. |
23. Connect the electrical connectors to the fuel injectors |
24. Attach the vacuum hose to the brake servo. |
25. Connect the hoses going to a heater. |
| 26. Connect the fuel hose to the fuel line. |
27. Set the accelerator cable. |
28. Install the upper and lower radiator hoses and fix their collars. |
29. Install the intake of fresh air. |
| 30. Establish a support battery and battery. Torque: 13.5-16 N ??? m |
31. Fill in cooling liquid in cooling system. |
32. Connect the wires to the positive and negative terminals of the battery. |
33. Check levels and, if necessary, add all liquids. |
34. Start up the engine, check the operation and leaks of liquids. |