1. Clean the mounting surface of the sealing ring. |
2. Lubricate the new O-ring with fresh coolant, and install it at the pump. |
3. Set the water pump so that the pump housing has plug bottom. |
4. Secure the water pump bolts, having tightened their moment of 15 Nm. |
5. Set the guide roller and secure it with a new bolt, having tightened its moment of 40 Nm dovernuv at an angle of 90 ?�. |
6. Install the timing belt. |
7. Install the V-ribbed belt. |
TDI diesel engines |
8. Install the pipe connecting the radiator nadduvaemogo air intake manifold, and fix it with clamps. |
9. Fill the coolant in the engine cooling system. |