add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Micra (2002 model year)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Micra
Home
 
Nissan
Micra
Introduction
Controls and operation receptions
Options and car routine maintenance
Engine
The general information and preparatory operations
Check the compression pressure
Checking the engine by means of the vacuum gauge
Checking the motor oil pressure
Replace accessory drive belt and the intermediate roller belts
Removal and installation of the inlet pipeline
Removing and installing exhaust manifold, catalytic converter and lambda probe
Removing and installing sump and maslozabornika
Removing and installing cylinder head cover
Removal, check and installation of camshafts
Check and adjust valve clearances
Removing and installing timing chain
Removing and installing crankshaft seals
Removing and installing, disassembling and assembling the cylinder head
Removal and installation of the power unit
Service oil pump
Dismantling and assembling cylinder
The engine cooling system, heating, ventilation and air conditioning
The power supply system and exhaust
Systems of an electric motor
Manual box of a gear change and clutch
Automatic Transmission
Drive shafts, steering knuckles and Hub assembly
Brakes
Suspension and steering
Body
Onboard electric
Diagrams
 


Hit Counter by Digits


print page printable version

Removal and installation of the inlet pipeline



Components of inlet pipe

1 - Support bracket
2 - Laying

3 - Pin
4 - The intake pipe

PERFORMANCE ORDER

  1. Remove the air intake hose and air cleaner assembly covers (see. Section Removal and installation of components of an inlet air path).
  2. Remove hose PCV (between the intake manifold and cylinder head cover) from the intake manifold.
  3. Remove the bolt support bracket (1 in the illustration above).
  4. Give nuts and bolts in the reverse order specified in the illustration Sequence of a tightening of fasteners of the intake pipe.

Sequence of a tightening of fasteners of the intake pipe

Giving Away nuts ?��5


?��6 in the illustration Sequence of a tightening of fasteners of the intake pipe when removing the semantic load does not bear; the giving and tightening the nuts and ?��4 ?��5 can be alleviated by setting the key in the corresponding recesses (2 in the illustration Giving Away nuts ?��5).

  1. Remove the intake manifold.
  2. Installation is in the reverse order. Pay attention to the cleanliness and flatness of the mating surfaces. Tighten the fasteners in the sequence indicated in the illustration Sequence of a tightening of fasteners of the intake pipe.

?��6 in the illustration Sequence of a tightening of fixture of the inlet pipeline points to re-tightening of bolts ?��1.





« previos page
Replace accessory drive belt and the intermediate roller belts
next page »
Removing and installing exhaust manifold, catalytic converter and lambda probe

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.