add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
Cooling
Heating and ventilation system
Fuel and exhaust system
Carbureted engines
Engines with fuel injection system
The power supply / exhaust
Models with one-point electronic fuel injection
Models with multi-point electronic fuel injection
Specifications
Air filter
An accelerator rope
The accelerator pedal
Fuel Injection System
Fuel system
Fuel pump
Fuel Level Sensor
Fuel tank
Throttle Body
Elements of the fuel injection system (engines of 1.6 liters)
Elements of the fuel injection system (engines of 2.0 liters)
The fuel manifold and fuel injectors
Fuel pressure control
Throttle potentiometer
Air Flow Sensor
Additional air valve
The solenoid valve of the engine fast
Adjusting the air supply unit (idle)
Air intake control valve
Sensor crankshaft angle
Power Transistor
The gauge of detonation combustion of fuel
The electronic control unit of engine work
The switch of neutral transfer
The switch of blocking of a starter / reversing light
Switch the engine-ECU and fuel pump
The switch in the steering gain
Switch the air conditioning system
Speed sensor
Intake manifold
Emission of exhaust gases
The system of the engine is started
Coupling
Transmissions
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

Adjusting the air supply unit (idle)



Adjusting the air supply unit when the engine is idling mounted on the right side of the intake manifold.

Before his removal, disconnect the negative battery terminal.

Refitting

PERFORMANCE ORDER
1. Disconnect the connection of the additional control valve and air solenoid valve quick work of the engine idling and remove the wires from the mounting clamps.
2. Turn off fixing bolts and remove the block from the intake manifold. Peel off the pad and throw it away; When installing, use a new one.
3. When installing, make sure that the contact surfaces of the block and intake manifold are clean and dry, then install the new gasket. Install the nut adjusting the air supply, and tighten the mounting bolts. Plug connectors and connection wire of the negative battery terminal.




« previos page
The solenoid valve of the engine fast
next page »
Air intake control valve

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.