add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
The petrol engine of 1.4 and 1.6 liters
The petrol engine of 2.0 liters
Kinds of repair without dismantling the engine from the vehicle
Technical data
Compression check in engine cylinders
The order of installation of the piston of 1st cylinder at top dead center of the compression stroke
Cylinder head cover
The crankshaft pulley
The cover of a chain drive of cam
The chain drive of cam
Chain tensioner, damper and sprocket drive
Camshafts
The valve levers and hydraulic controls
Cylinder head
Sump
Oil pump
Oil Cooler
Seals, crankshaft
A flywheel (or a leading disk of the torque converter)
Suspension parts of the power unit
Dismantle and engine major repairs
Diesel engine
Cooling
Heating and ventilation system
Fuel and exhaust system
The system of the engine is started
Coupling
Transmissions
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

Compression check in engine cylinders



See. Subsection 3.1.1.2.




« previos page
Technical data
next page »
The order of installation of the piston of 1st cylinder at top dead center of the compression stroke

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.