add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Kia Sportage (1999 release)

general info. full specifications. diagnostics. hints. tips. tricks
Kia Sportage
Home
 
Kia
Sportage
Introduction
Controls and operation receptions
Current care and maintenance
Engine
System of cooling, heating, ventilation and air conditioning
general information
Engine cooling system
Ventilation systems, heating and air conditioning
General information and safety measures
Troubleshooting, check the system components K /
Removal and installation of assemblage blower / evaporator service components
Removal and installation of the heater assembly, maintenance components
Removal and installation of communication lines refrigerator path of K /
Removal, check and installation of compressor K / V
Removal, check and installation of the fan of the condenser K / V
Removal, check and installation of the condenser K / V
Removal, check and installation of the receiver-dryer
The power supply system, motor control / emission control and exhaust
Systems of an electric motor
A five-speed manual gearbox gear
Automatic Transmission
Transmission Line
Brakes
Suspension and steering
Body
Onboard electric
The control body dimensions
Wiring
 


Hit Counter by Digits


print page printable version

Removal and installation of communication lines refrigerator path of K /



PERFORMANCE ORDER

  1. Support the wheel chock.
  2. Forces trained professionals make detente a refrigerator path system K / V.

Line evaporator

Withdrawal

PERFORMANCE ORDER

  1. Check the path of the engine cooling components for signs of leaks.
  2. Disconnect and remove the battery.
  3. Remove the mounting bolts, wiring and connectors Disconnect the hose connecting the feed pump and remove the tank windscreen washer fluid in the engine compartment (see chap. Body).
  4. Loosen the flare nuts / bolts on both ends of the line to be lifting.
  1. Remove the nut fastening clamps.
  1. Release the line from intermediate clamps and remove it from the vehicle.

Setting

PERFORMANCE ORDER

  1. Get a change of line on the regular place and snap it into the interim latches.
  1. Manually capitalize on a couple of threads of the two flare nuts.
  2. Align the line and tighten the flare nuts to the required torque (13 Nm 32 Nm).
  3. Screw the socket bolts to the engine compartment bulkhead and tighten them with demanded effort (24 Nm).
  4. Screw and tighten the retaining nut low.
  5. Forces trained professionals make evacuation, vacuum check and charging of a refrigerator path system K / V.
  6. Install and connect the battery.
  7. Start the engine, activate the K / V connectors and inspect the choke refrigerator path for signs of leaks. If necessary, make appropriate corrections.

Flexible hoses

Withdrawal

PERFORMANCE ORDER

  1. Release nut and remove the compression fittings suitable hose.

Setting

PERFORMANCE ORDER

  1. Keep a hose on the regular place.
  2. Screw the flare nuts and tighten them with demanded effort (depending on the connection point).
  3. Forces trained professionals make evacuation, vacuum check and charging of a refrigerator path system K / V.
  4. Start the engine, activate the K / V connectors and inspect the choke refrigerator path for signs of leaks. If necessary, make appropriate corrections.




« previos page
Removal and installation of the heater assembly, maintenance components
next page »
Removal, check and installation of compressor K / V

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.