1 - a bolt, 120 Nm and tighten on a corner 90 ?�. When installing, use a new bolt. Dovorachivanie bolt 90 ?� can be performed in several stages; 2 - a bolt, 120 Nm and tighten on a corner 90. When installing, use a new bolt; 3 - a bolt, 15 Nm; 4 - a nut, 22 Nm; 5 - the bottom casing of a gear belt; 6 - a bolt, 10 Nm; 7 - an average casing of a gear belt; 8 - a bolt, 45 Nm; 9 - a support of the power unit; 10 - the top casing of a gear belt; 11 - a gear belt. Before installation, check the timing belt for wear. Before removing the toothed belt is necessary to note the direction of rotation. It does not bend a gear belt; 12 - the guide roller; | 13 - a bolt, 20 Nm, and tighten on a corner 90. When installing, use a new bolt; 14 - a nut, 20 Nm; 15 - a bolt, 20 Nm; 16 - a bolt, 45 Nm; 17 - a pulley of a gear belt of a camshaft; 18 - a tension roller; 19 - the guide roller; 20 - a pulley of a gear belt of high pressure fuel pump; 21 - a bolt, 30 Nm; 22 - a back casing of a gear belt; 23 - the water pump; 24 - the guide roller; 25 - a pulley of a gear belt of a cranked shaft; 26 - mounting sleeve; 27 - high pressure fuel pump (pump); 28 - an arm; 29 - a bolt, 45 Nm |