add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Terrano II (from 1985 to 1999 model year)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Terrano 2
Home
 
Nissan
Terrano 2
Operation and Maintenance
Maintenance Vehicle
The four-cylinder engine
Engines VS
All engines
Overview
Compression check in engine cylinders
Dismantle of the power unit - security measures
Engine - removal and installation
Overhaul engine -General information
Recovery engine -alternativy
Overhaul of the engine - the order of disassembly
Cylinder head - dismantling.
Cylinder head-cleaning and testing of state
Cylinder head - assembly
Connecting rod and piston group and dismantling
Crankshaft - Removal
Cylinder Block - Cleaning
Cylinder Block - check status
Connecting rods and pistons - check status
Kolenval- status check
Main and connecting rod bearings - Check and selection
Overhaul of engine-assembly order
Piston Rings setting
:20. Kolenval- installation and check of backlashes of radical bearings
The rear oil seal - Installation
Connecting rods and pistons - installation and check connecting rod bearing clearances
Start the engine after repair and running
Systems of cooling, heating, ventilation and air conditioning
Fuel and an exhaust system
The system of electric motor
Emission of exhaust gases
Manual transmission
Automatic Transmission
Coupling the propeller shaft and rear axle
Chassis car with wheel formula 4x4
Brakes
Suspension and steering
Body and trims
Electrical system
 


Hit Counter by Digits


print page printable version

Cylinder Block - check status



1. Upon detection of external defects (cracks and chips), repair or replace the unit. It is recommended to check for internal defects in the engine block, which must pass a block to the studio Car.
2. Check the roundness and taper of the cylinder, measure the diameter in three dimensions, in directions parallel and perpendicular to the axis of the unit (see photo). If the results are different from the standard, the unit should be returned to the workshop repair. After the restoration of the block need pistons and rings of the repair sizes.
3. If the state of the cylinder acceptable wear of the cylinder and the gap between the cylinder and the piston do not exceed the established norms, the cylinders need othon-ningovat (photo). The work is recommended to perform in the service station.
4. Check the deformation of a demountable plane of the cylinder (see photo). If the deviation from a plane exceeds norm, the unit should be abraded in the workshop car service. The thickness of the material taken from the unit should not exceed the thickness of the material removed from the head. If the total size, which decreased after grinding igolovka unit exceeds 0.2 mm, the head and the unit should be replaced.

14.3b A typical form of the cylinder surface after honningovaniya
14.3b A typical form of the cylinder surface after honningovaniya


14.4a Check deformation of a demountable plane of the block of cylinders
14.4a Check deformation of a demountable plane of the block of cylinders


In this case, new pistons are matched by the marking on the cylinder block (photo).




« previos page
Cylinder Block - Cleaning
next page »
Connecting rods and pistons - check status

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.