add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Terrano II (from 1985 to 1999 model year)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Terrano 2
Home
 
Nissan
Terrano 2
Operation and Maintenance
Maintenance Vehicle
The four-cylinder engine
Engines VS
All engines
Overview
Compression check in engine cylinders
Dismantle of the power unit - security measures
Engine - removal and installation
Overhaul engine -General information
Recovery engine -alternativy
Overhaul of the engine - the order of disassembly
Cylinder head - dismantling.
Cylinder head-cleaning and testing of state
Cylinder head - assembly
Connecting rod and piston group and dismantling
Crankshaft - Removal
Cylinder Block - Cleaning
Cylinder Block - check status
Connecting rods and pistons - check status
Kolenval- status check
Main and connecting rod bearings - Check and selection
Overhaul of engine-assembly order
Piston Rings setting
:20. Kolenval- installation and check of backlashes of radical bearings
The rear oil seal - Installation
Connecting rods and pistons - installation and check connecting rod bearing clearances
Start the engine after repair and running
Systems of cooling, heating, ventilation and air conditioning
Fuel and an exhaust system
The system of electric motor
Emission of exhaust gases
Manual transmission
Automatic Transmission
Coupling the propeller shaft and rear axle
Chassis car with wheel formula 4x4
Brakes
Suspension and steering
Body and trims
Electrical system
 


Hit Counter by Digits


print page printable version

Connecting rods and pistons - installation and check connecting rod bearing clearances



1. Before installing the piston assembly from the cylinder rods must be absolutely clean, from the edges of the cylinder shall be blunted, and the crankshaft is installed in the engine block.
2. Wipe the upper rear surface of the new connecting rod bearing and place it in place in the connecting rod. Make sure that the protrusion on the insert went into the sample in a rod and lubricant apertures aligned (photo). The insert is not lubricated. Similarly, set the rod cover the bottom insert.
3. Place joints of piston rings in accordance with the scheme (see photo).
4. Grease pistons and rings with pure oil for the engine, squeeze the ring device (photo), leaving a protruding portion of the piston.

22.3a alignment joints of piston rings (up to 1990) 1. Top compression ring2. The upper disc valve stem koltsa3. Extender oil scraper koltsa4. The plane of rotation kolenvala5. Axis paltsa6. The lower disk valve stem koltsa7. Nor
22.3a alignment joints of piston rings (up to 1990)
1. The upper compression ring
2. The upper disc scraper ring
3. expander oil ring
4. The plane of rotation of the crankshaft
5. The axis of the finger
6. Lower the drive oil scraper ring
7. No


22.2 Installation of the insert in the connecting rod
22.2 Installation of the insert in the connecting rod


5. Turn the crankshaft to the bottom dead center in the first cylinder, lubricate the cylinder walls with oil for the engine.
6. Align the piston so that the mark F or PUNCHING (on engines V6) were facing the front of the engine (photo).
7. Carefully insert the lower part of the piston rod into the first cylinder to the stop device for compression rings in the engine block. Lightly tap the top edge of the mandrel for uniform contact with the plane of the cylinder.
8. Enter the piston into the cylinder by gently tapping the wooden handle of a hammer on the piston crown (photo). Much effort is not included.
9. Tighten the connecting rod to the crankshaft journal and check the clearance in the connecting rod bearings (photo). The verification procedure

22.36 The alignment of joints of piston rings (after 1990) 1. Top compression ring2. The upper disc valve stem koltsa3. The lower disk valve stem koltsa4. Lower compression koltso5. To the front of the dvigatelya6. Expander maslose
22.36 The alignment of joints of piston rings (after 1990)
1. The upper compression ring
2. The upper disc scraper ring
3. Lower the drive oil scraper ring
4. The lower compression ring
5. By the front of the engine
6. Expander maslose


22.4 Preparation of the piston and connecting rod to be installed into the cylinder is not different from the procedure for the main bearing (See above.). The rotation of the crankshaft, or the slightest hit of oil on loose leaves at measurements are not allowed. Nuts cover of a rod tighten with the set
22.4 Preparation of the piston and connecting rod to be installed into the cylinder is not different from the procedure for the main bearing (See above.). The rotation of the crankshaft, or the slightest hit of oil on loose leaves at measurements are not allowed. Nuts cover of a rod tighten with the set


10. Carefully remove the remnants of the caliber of grease liners and crankshaft journal, replace the cover and tighten the nuts evenly to the specified torque.
11. Repeat these steps for the other rods.
12. After the final installation of pistons with rods,
Check up freedom of rotation of the crankshaft.
13. Check the axial play of the connecting rod (see. Above). Keep in mind that after the installation of new parts backlash and can be smaller than normal and require grinding rods.
14. Assemble and install the engine to the relevant sections




« previos page
The rear oil seal - Installation
next page »
Start the engine after repair and running

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.