add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Kia Sportage (1999 release)

general info. full specifications. diagnostics. hints. tips. tricks
Kia Sportage
Home
 
Kia
Sportage
Introduction
Controls and operation receptions
Current care and maintenance
Engine
System of cooling, heating, ventilation and air conditioning
general information
Engine cooling system
Ventilation systems, heating and air conditioning
General information and safety measures
Troubleshooting, check the system components K /
Removal and installation of assemblage blower / evaporator service components
Removal and installation of the heater assembly, maintenance components
Removal and installation of communication lines refrigerator path of K /
Removal, check and installation of compressor K / V
Removal, check and installation of the fan of the condenser K / V
Removal, check and installation of the condenser K / V
Removal, check and installation of the receiver-dryer
The power supply system, motor control / emission control and exhaust
Systems of an electric motor
A five-speed manual gearbox gear
Automatic Transmission
Transmission Line
Brakes
Suspension and steering
Body
Onboard electric
The control body dimensions
Wiring
 


Hit Counter by Digits


print page printable version

Removal, check and installation of the condenser K / V



Withdrawal

PERFORMANCE ORDER

  1. The condenser is placed directly in front of the radiator.
  2. Support the wheel chock.
  3. Disconnect the negative wire from the battery.
  4. Forces trained professionals make detente a refrigerator path system K / V.
  5. Disconnect from the condenser refrigeration line - immediately plug the open ends of the choke connectors to prevent internal contamination of the working path K / V.
  6. Remove the condenser fan (see. Section Removal, check and installation of the fan of the condenser K / V).
  1. Remove the four mounting screws, remove the base from the bonnet and carefully, trying not to damage the fins, put it on the bottom section of the casing.
  1. With a special emphasis lock the hood in the raised position, then remove the top panel front cover assembly with the standard focusing hood.
  1. Release wiring harness from intermediate clamps on the front panel of the casing.
  1. Pulling up, release the wiring from the left and right sections of the front casing.
  1. Route between the radiator and the condenser sheet of cardboard.
  1. Release fixing nuts and fed up, remove the condenser - the heat sink is necessary to remove the reference pins and capacitor pull slightly forward.

Check

PERFORMANCE ORDER

  1. Examine the condenser for any signs of leakage, deformation of plates and other mechanical damage to the heat exchanger, - if necessary, give an assembly for repair.
  1. Wear protective goggles and blow compressed air heat exchanger, manually remove the jammed foreign objects between the plates.

Setting

PERFORMANCE ORDER

  1. Installation is the reverse order of disassembly of components - Ensure compliance with the Specifications of the Head of System of cooling, heating, ventilation and air conditioning systems to the efforts of a tightening of threaded fasteners.
  2. In conclusion, by trained specialist evacuated, vacuum check and charging of a refrigerator path system K / V, then start the engine, activate the K / V connectors and inspect the choke refrigerator path for signs of leaks. If necessary, make appropriate corrections.




« previos page
Removal, check and installation of the fan of the condenser K / V
next page »
Removal, check and installation of the receiver-dryer

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.