| Kia |  | Sportage | | Introduction | | Controls and operation receptions | | Current care and maintenance | | Engine | | System of cooling, heating, ventilation and air conditioning | | general information | | Engine cooling system | |  | Ventilation systems, heating and air conditioning | | | General information and safety measures | | | Troubleshooting, check the system components K / | | | Removal and installation of assemblage blower / evaporator service components | | | Removal and installation of the heater assembly, maintenance components | | | Removal and installation of communication lines refrigerator path of K / | | | Removal, check and installation of compressor K / V | | | Removal, check and installation of the fan of the condenser K / V | | | Removal, check and installation of the condenser K / V | | |  | Removal, check and installation of the receiver-dryer | | The power supply system, motor control / emission control and exhaust | | Systems of an electric motor | | A five-speed manual gearbox gear | | Automatic Transmission | | Transmission Line | | Brakes | | Suspension and steering | | Body | | Onboard electric | | The control body dimensions | |  | Wiring | | |
|
|
|
printable version
Removal, check and installation of the receiver-dryer
Withdrawal | - Disconnect the negative wire from the battery.
- Forces trained professionals make detente a refrigerator path system K / V.
| - Disconnect from the receiver-dryer line refrigerator path - immediately plug the open ends of choke sockets.
|
- Remove the support bracket and set aside on the mudguard wing assembly coal adsorber.
| - Disconnect the electrical connector.
|
- Give three fixing nuts and remove the receiver-dryer.
|
|
Check the two-level sensor, pressure switch | - Switch off the ignition.
- Acting in accordance with the manufacturer's instructions, connect the special measuring unit and measure the pressure in the high-pressure refrigerant circuit path. If the result is different from the 608 kPa test components make a refrigerator path, otherwise proceed to the next step.
| - Disconnect electroconducting from the gauge-switch bi-level and check the last pin on conductivity presence between plugs ?��?�� 1 and 2. If the result is not correct, replace the sensor switch.
|
|
|
Setting | - Installation is the reverse order of disassembly of components - Ensure compliance with the Specifications of the Head of System of cooling, heating, ventilation and air conditioning systems to the efforts of a tightening of threaded fasteners.
- In conclusion, by trained specialist evacuated, vacuum check and charging of a refrigerator path system K / V, then start the engine, activate the K / V connectors and inspect the choke refrigerator path for signs of leaks. If necessary, make appropriate corrections.
|
|
|
|