add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Sunny (from 1991 to 1997, the year of issue)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Sunny
Home
 
Nissan
Sunny
Instructions
Maintenance
Engines
The petrol engine of 1.4 and 1.6 liters
The petrol engine of 2.0 liters
Diesel engine
Specifications
Toothed belt
Replacing cylinder head gasket
Valves
Replacing the valve stem seal
Checking the valve guides
Lapping valve seat
Processing cylinder head / valve
Checking / adjusting valve clearance
Compression Test
V-belt
Faults Engine
Engine lubrication system
Oil circuit
Removing and installing sump
Oil pump
Cooling system
Injection Device
Spark plug
Power system
Check / replacement of valve fuel cut
No-load speed and the maximum speed
Sprayers
Start feeding high pressure fuel pump
Operation in winter
Technical data of the power of a diesel engine
Helpful tips for owners of diesel car
Cooling
Heating and ventilation system
Fuel and exhaust system
The system of the engine is started
Coupling
Transmissions
Axles
Brakes
Suspension and steering
Body
Electrical
 


Hit Counter by Digits


print page printable version

No-load speed and the maximum speed



Check / adjust the idle speed and the maximum speed

Since diesel engines have no ignition system requires a special tachometer, working on solar cells.

PERFORMANCE ORDER
1. Warm up the engine to operating temperature. Coolant Temperature min. +80 ?� C
2. electrical consumers (radio, light) should be turned off.
3. Connect the tachometer.
4. Allow the engine 2-3 times greater momentum and leave to idle.
5. Cock a manual brake.
6. Check the idle speed.
7. If the idle speed is not installed correctly, loosen the lock nut and adjust the number of revolutions of the rotation of the adjusting screw (1). After adjustment Tighten the screw.

A warning

Do not turn the other screws.


Check / adjust the maximum speed

PERFORMANCE ORDER
1. Check the adjustment of the drive gas.
2. Fully depress the accelerator pedal and check the maximum speed.
3. If the maximum speed is not installed correctly, loosen the lock nut and adjust the number of turns, rotating the adjusting screw. After adjustment Tighten the screw and install the new seal.

A warning

Do not turn the other screws.


4. Disconnect the tachometer.

Adjusting damper

PERFORMANCE ORDER
1. Start the engine and warm up until the temperature gauge coolant reaches the middle of the scale.
2. Connect the tachometer.
3. Uvelichitte with a lever RPM and slowly release until the adjusting screw touches the damper. The number of revolutions should be at the same time in 1300 rev / min.
4. If necessary, the required number of turns with the screw.




« previos page
Check / replacement of valve fuel cut
next page »
Sprayers

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.