add to favorites contacts sitemap
REPAIR MAINTENANCE OPERATION OF MOTOR VEHICLES
Nissan Maxima QX (1993 release)

general info. full specifications. diagnostics. hints. tips. tricks
Nissan Maxima QX
Home
 
Nissan
Maxima QX
Introduction
Operating Instructions
Adjustment and routine maintenance
Engine
System of cooling, heating
The power supply system and release
general information
Dropping the pressure in the supply system
Check of serviceability of functioning of the fuel pump, the fuel pressure measurement
Check and replacement of fuel lines and compression fittings
Removal and installation of the fuel pump
Check and replacement of the gauge of fuel consumption
Removing and installing fuel tank
Cleaning and repair of the fuel tank - an overview
Removal and installation of assemblage of an air cleaner
Removal, installation and adjustment of a cable of an accelerator
The electronic fuel injection (EFI) - General Information
Check of serviceability of functioning of system of injection
Check and replace the throttle body
Removal and installation of the fuel pressure regulator
Removal and installation of a fuel highway and injectors injection
Check and adjustment of turns of idling
Exhaust system - general information
Electric motor
Engine Control Systems
Transmission
Coupling and power shafts
Brakes
Suspension and steering
Body
Onboard electric
 


Hit Counter by Digits


print page printable version

Check and replace the throttle body



Before proceeding with the procedures wait full cooling of the engine! See. As a warning at the beginning of Section Dropping the pressure in the fuel system.


PERFORMANCE ORDER

1. Disconnect the negative wire from the battery.

If installed on the car stereo is equipped with a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

2. Remove the outlet of the air cleaner from the intake duct or throttle body.
3. Disconnect the wiring from the throttle body throttle position sensor (TPS) (see chap. Engine management). Also, label and disconnect all vacuum hoses.
4. Disconnect the throttle cable (see. Section Removal, installation and adjustment of a cable of an accelerator) and at the appropriate vehicle, Tempostat.

5. Disconnect the hoses from the throttle body cooling path. To minimize loss of coolant immediately plug the open ends of the lines.

6. Remove the throttle body bolts. On models 1993 and 1994 Vol. Remove the air intake duct. Remove the throttle body with the gasket. Scrape the material traces of the old gasket from the mating surfaces of the throttle body and the pumping chamber inlet pipeline.

7. Install in the reverse order. Be sure to replace the gasket. Finally, make adjustment of the throttle cable and Tempostat (see. Section Removal, installation and adjustment of a cable of an accelerator). Check the coolant level, if necessary, appropriate adjustment (see chap. Adjustment and routine maintenance).





« previos page
Check of serviceability of functioning of system of injection
next page »
Removal and installation of the fuel pressure regulator

Copyright © 2010 AutoManuals.biz. Trademarks belong to their respective owners. All rights reserved.