| 1. Clean the sealing surfaces and check them on line no distortion. |
| 2. Screw the intake line with a new gasket (19/3). Alternately tight tighten bolts to 20 Nm (approximate value). |
| 3. Cruise control: Hook the connecting rod. |
| 4. Automatic gearbox: Attach the Bowden cable, the control signal pressure, and adjust the cable. |
| 5. Enter the throttle cable through the hole in the support, push it into the support and secure. |
| 6. Hang the piece together with the guide wire throttle. Pay attention to the plastic nipple was registered in the guide part. |
| 7. Loosen the power steering pump rack drive, then insert the bolt (15/1) to the intake manifold and screw it. Tighten the power steering pump rack drive. |
| 8. In accordance with the markings made earlier spread on the intake gas pipe lines under vacuum. |
| 9. Screw the pipe being under vacuum brake booster. |
| 10. Push the pipe (77/2), going to the regeneration valve. |
| 11. Install the ignition coil. |
| 12. Screw the rack intake manifold. |
| 13. Connect the electrical wires to the executive body of the control system engine speed to idle. Attach the wire clamp and lock in a spring clip. |
| 14. Install the washer and screw vessel. |
| 15. Screw the well-to-wire. |
| 16. Install the fuel rail with injection valves. |
| 17. Fit the transverse pipe of the air filter. |
| 18. Adjust the throttle cable. |
| 19. Connect the terminal of the battery ground cable (-). Set the clock. 38. Enter the anti-theft code for the radio. |
| 20. Start the engine and check the tightness of all connections. |
| 21. Check the idle speed (work for the garage). |