1. Remove the upper section of the pipeline. 2. Mark and disconnect all prevent the dismantling of the lower section of the hoses and wiring. 3. Remove the fuel line pipe with injectors of injection (see chap. The power supply system and release). | 4. Operating in reverse order shown in the illustration, in several installments (by 1/4 of a turn for the approach), loosen the screws / nuts of the pipeline so that there was the possibility of a reversing them manually. |
5. If the pipeline "has become attached" and can not be separate from the cylinder head, it Tap the hammer through a wooden block. | In no case the pipeline to hook the lever under the mating surface. |
6. Carefully smooth out interfaced surfaces of the pipe and cylinder heads completely removing them from the traces of the old gasket material and sealant, and then wiped with a cloth soaked in acetone. 7. Install the new gaskets and pipe - track correctness of placing components on the mounting studs. Screw nuts. | 8. In the strict order in several stages of the pipeline Tighten with demanded effort. | Efforts of a tightening of nuts differ from the efforts of a tightening of bolts. |
|
9. The further installation is made in the reverse order of dismantle of components. Do not forget to fill the cooling system and change the engine oil (see chap. Adjustment and routine maintenance). 10. Start the engine and check for any signs of leakage of fuel, coolant and loss of vacuum. |